The competencies of project managers working with agile and traditional approaches: a comparative study

Authors

DOI:

https://doi.org/10.5585/gep.v12i1.17534

Keywords:

Competencies, Project Management Methodologies, Agile Methodologies, Project Leadership.

Abstract

The world is rapidly changing, forcing organizations to adapt their processes in order to respond quickly to these constant changes. In the project management scenario, new methodologies are increasingly present, bringing a more agile and lean approach. In this context, the project manager with formal authority over the team is gradually giving way to a leader who acts more as a facilitator, removing obstacles and promoting collaboration and continuous learning. Thus, the objective of this article is to compare the competencies considered most important for a project manager who works predominantly with Traditional methodologies and the project leader who uses Agile approaches. For this, a survey was carried out, using an online questionnaire, submitted to professionals working on projects. The 142 valid responses received were subjected to parametric through correspondence and profile analysis, as well as non-parametric statistical analysis, using Kendall's rank correlation coefficient method. The five competencies considered most important were the same for the two groups, but they were ordered in different ways. They are: Personal Integrity and Reliability, Personal Communication, Teamwork, Strategy and Relationships and Engagement Statistical analyzes did not allow categorically concluding that there are differences in the perception of the importance of skills by professionals working with Agile and Traditional methodologies, opening a very promising discussion about the way in which these new approaches are being incorporated by organizations and perceived by its professional.

Author Biographies

Maria Paula Novakoski Perides, FEA-USP

Doutranda em Administração na Universidade de São Paulo

Erika Borgonovo Barrote, FEA-USP

Mestranda em Administração na Universidade de São Paulo

Roberto Sbragia, FEA-USP

Doutor em Administração pela Universidade de São Paulo

Pós-doutor em Ciências de Engenharia e Gestão pelo Instituto Tecnológico da Universidade  Northwestern (EUA) 

Professor Titular do Departamento de Gestão da Faculdade de Economia, Negócios e Contabilidade (FEA) da Universidade de São Paulo (USP)

References

Ambler, S. W., & Lines, M. (2020). Choose your WOW! A Disciplined Agile Delivery Handbook for Optimizing Your Way of Working. Pennsylvania, EUA: Project Management Institute, Inc.

Barlow, J., Giboney, J., Keith, M. J., Wilson, D., Schuetzler, R., Lowry, P. B., & Vance, A. (2012). Overview and Guidance on Agile Development in Large Organizations. Communications of the Association for Information Systems, 29(2), 25–44. doi: 10.2139/ssrn.1909431

Beck, K., Beedle, M., Bennekum, A. van, Cockburn, A., Cunningham, W., Fowler, M., … Thomas, D. (2001). The Agile Manifesto. Recuperado de: www.agilemanifesto.org. Acesso em 18/abr/2019

Boehm, B., & Turner, R. (2005). Management challenges to implementing agile processes in traditional development organizations. IEEE Software, 22(5), 30–39. doi: 10.1109/MS.2005.129

Boyatzis, R. E. (1982). Competent manager: a model for effective performance. New York: Wiley & Sons.

Cheng, M.-I., Dainty, A. R. J., & Moore, D. R. (2005). What makes a good project manager ? Human Resource Management Journal, 15(1), 25–37. doi: 10.1111/j.1748-8583.2005.tb00138.x

Chipulu, M., Neoh, J. G., Ojiako, U., & Williams, T. (2013). A Multidimensional Analysis of Project Manager Competences. IEEE Transactions On Engineering Management, 60(3), 506–517. doi:10.1109/TEM.2012.2215330

Cockburn, A., & Highsmith, J. (2001). Agile Software Development: The People Factor. Computer, 34(11), 131–133. doi: 10.1109/2.963450

Cram, W. A., & Marabelli, M. (2018). Have your cake and eat it too? Simultaneously pursuing the knowledge-sharing benefits of agile and traditional development approaches. Information and Management, 55(3), 322–339. doi: 10.1016/j.im.2017.08.005

Denning, S. (2016a). How to make the whole organization "Agile". Strategy & Leadership, 44(4), 10–17. https://doi.org/10.1108/SL-09-2015-0074

Denning, S. (2016b). Understanding the three laws of Agile. Strategy & Leadership, 44(6), 3–8. doi: 10.1108/SL-09-2016-0074

Denning, S. (2019). Lessons learned from mapping successful and unsuccessful agile transformation journeys. Strategy & Leadership, 47(4), 3–11. doi: 10.1108/SL-04-2019-0052

Dutra, J. S. (2017). Competências: conceitos, instrumentos e experiências (2a ed.). Sao Paulo: Atlas.

Dybå, T., & Dingsøyr, T. (2008). Empirical studies of agile software development: A systematic review. Information and Software Technology, 50(9–10), 833–859. doi: 10.1016/j.infsof.2008.01.006

Erickson, J., Lyytinen, K., & Siau, K. (2005). Agile Modeling, Agile software Development, and extreme programming: the state of research. Journal of Database Management, 16(4), 88–100. doi: 10.4018/jdm.2005100105

Fleury, A., & Fleury, M. T. (2000). Estratégias Empresariais e Formação de Competências: Um Quebra-cabeça Caleidoscópico da Indústria Brasileira. São Paulo: Atlas.

Freitas, H., Oliveira, M., Saccol, A. Z., & Moscarola, J. (2000). O Método de Pesquisa Survey. Revista de Administração, 35(3), 105–112.

Garcia, F. A. Z., & Russo, R. F. S. M. (2019). Leadership and performance of the software development team: Influence of the type of project management. Revista Brasileira de Gestao de Negocios, 21(4), 970–1005. doi: 10.7819/rbgn.v21i5.4028

Gerster, D., Dremel, C., Brenner, W., & Kelker, P. (2020). How Enterprises Adopt Agile Forms of Organizational Design: A Multiple- Case Study. The DATA BASE for Advances in Information Systems, 51(1), 84–103. doi: 10.1145/3380799.3380807

Gibbons, J. D., & Chakraborti, S. (2011). Nonparametric Statistical Inference (5th ed.). Boca Raton, FL EUA: Chapman & Hall.

Gill, A. Q., Henderson-Sellers, B., & Niazi, M. (2018). Scaling for agility: A reference model for hybrid traditional-agile software development methodologies. Information Systems Frontiers, 20, 315–341. doi: 10.1007/s10796-016-9672-8

Hardle, W., & Simar, L. (2003). Applied Multivariate Statistical Analysis. New York, EUA: Springer-Verlag Berlin Heidelberg.

IPMA - International Project Management Association. (2015). Individual Competence Baseline for Project, Programme and Portfolio Management (4th ed.). Zurich: International Project Management Association. Recuperado de: https://www.pma.at/files/downloads/440/ipmaicb4.pdf. Acesso em 18/abr/2019

IPMA - International Project Management Association. (2018). IPMA Reference Guide ICB4 in an Agile World (Version 2.2). Zurich: International Project Management Association. Recuperado de: https://www.studocu.com/pt/document/instituto-superior-tecnico/mooc-agile-leadership/outro/ipma-reference-guide-icb4-in-agile-world/8580618/view. Acesso em 17/abr/2019

Kendall, M. G. (1942). Partial Rank Correlation. Biometrika, 32(3–4), 277–283. doi: 10.2307/2332130

Kregel, I., Ogonek, N., & Matthies, B. (2019). Competency profiles for lean professionals – an international perspective. International Journal of Productivity and Performance Management, 68(2), 423–446. doi: 10.1108/IJPPM-09-2017-0237

Larman, C., & Basili, V. R. (2003). Iterative and incremental development: A brief history. IEEE Computer Society, 36(6), 47–56. doi: 10.1109/MC.2003.1204375

Le Boterf, G. (2003). Desenvolvendo a Competência dos Profissionais (3a ed.). Porto Alegre - RS: Artmed Editora SA.

Loufrani-Fedida, S., & Missonier, S. (2015). The project manager cannot be a hero anymore! Understanding critical competencies in project-based organizations from a multilevel approach. International Journal of Project Management, 33(6), 1220–1235. doi: 10.1016/j.ijproman.2015.02.010

Matook, S., & Maruping, L. M. (2014). A competency model for customer representatives in agile software development. MIS Quarterly Executive, 13(2), 77–95.

McClelland, D. C. (1973). Testing for competence rather than for “intelligence.” American Psychologist, 28(1), 1–14. doi: 10.1037/h0034092

Müller, R., & Turner, R. (2010). Leadership competency profiles of successful project managers. International Journal of Project Management, 28(5), 437–448. doi: 10.1016/j.ijproman.2009.09.003

Nerur, S., Mahapatra, R., & Mangalaraj, G. (2005). Challenges of migrating to Agile methodologies. Communications of the ACM, 48(5), 73–78. doi: 10.1145/1060710.1060712

Noro, G. B., & Bronzatti, B. (2013). A Influência das Características do Gestor no Sucesso da Gestão de Projetos. Revista de Gestão e Projetos, 4(1), 77–115. doi: 10.5585/gep.v4i1.73

PMI - Project Management Institute. (2016). Guia do Conhecimento em Gerenciamento de Projetos (6a ed.). Pensilvânia, EUA: Project Management Institute, Inc.

PMI - Project Management Institute. (2017a). Guia Ágil. Pensilvânia, EUA: Project Management Institute, Inc.

PMI - Project Management Institute. (2017b). Project Manager Competency Development Framework (3rd ed.). Pensilvânia, EUA: Project Management Institute, Inc.

Rajagopalan, S. (2014). Review of the Myths on Original Software Development Model. International Journal of Software Engineering & Applications, 5(6), 103–111. doi: 10.5121/ijsea.2014.5607

Rigby, D. K., Sutherland, J., & Takeuchi, H. (2016). Embracing Agile. Harvard Business Review, 94(5), 40–48.

Romdhani, H., Lakhal-Chaieb, L., & Rivest, L.-P. (2014). An exchangeable Kendall’s tau for clustered data. The Canadian Journal of Statistics, 42(3), 384–403. doi: 10.1002/cjs.11223

Seymour, T., & Hussein, S. (2014). The History Of Project Management. International Journal of Management & Information Systems, 18(4), 233-240. doi: 10.19030/ijmis.v18i4.8820

Sieber, T. N., Petrini, O., & Greenacre, M. J. (1998). Correspondence analysis as a tool in fungal taxonomy. Systematic and Applied Microbiology, 21(3), 433–441. doi: 10.1016/S0723-2020(98)80053-2

Silveira, D. T., & Córdova, F. P. (2009). A pesquisa Científica. In T. E. Gerhardt & D. T. Silveira (Eds.). Métodos de Pesquisa (pp. 31-42). Porto Alegre: Editora da UFRGS.

Stevenson, D. H., & Starkweather, J. A. (2010). PM critical competency index: IT execs prefer soft skills. International Journal of Project Management, 28(7), 663–671. doi: 10.1016/j.ijproman.2009.11.008

The Standish Group International (1994). The Chaos Report (Vol. 53). Recuperado de https://www.standishgroup.com/sample_research_files/chaos_report_1994.pdf. Acesso em 18/abr/2019.

Published

2021-03-11

How to Cite

Perides, M. P. N., Barrote, E. B., & Sbragia, R. (2021). The competencies of project managers working with agile and traditional approaches: a comparative study. Revista De Gestão E Projetos, 12(1), 11–38. https://doi.org/10.5585/gep.v12i1.17534

Issue

Section

Articles